06/10/2026
In June, Roundhay Park hosted one of Leeds' biggest music events of the summer. 70,000 people, Lewis Capaldi headlining, and a brand activation stage that needed to sit perfectly flat on a hillside — led by THE·TEAM.
The Steeldeck configuration:
• Underground cables and pipes ruled out ground anchors entirely — and was ballasted instead
• 13 tonnes of weight beneath the deck to lock the structure in position
• Front edge standing 7ft tall at the bottom of the slope, completely level at the top
• Reinforced with scaffold underprops to carry pergolas, bars and a DJ booth
The engineering stayed completely out of sight. THE TEAM clad it out and delivered a seamless brand activation for Lidl.
Build and de-rig: twelve hours.
hashtag hashtag hashtag hashtag hashtag hashtag hashtag