28/06/2026
Event Information Header
Event Name: Graduation Ceremony of San Juan De Dios Hospital in Pasay City
Date of Event: June 28, 2028
Time of Event: 7:00 AM
Theme: Blue, Gold & Silver
Venue: San Juan De Dios Hospital Gym
Supplier/Stylist: Events by Gehn
Main Stage Structure
Elevated stage platform
Gray stage fascia/front wall
Center staircase with 3 red-carpeted steps
Gold trim on the stairs
Dark gray backdrop/wall
LED Wall
Large center LED wall 9X12ft
Blue and gold abstract graphic design
GD logo at the center
Gold ribbon/wave graphics
Gold sparkle/light effects
Measurements and Labels
LED Wall Width: 9x12 ft
Stage Length: 32 ft
Stage Height: 3ft
Vacant space for speakers (left): 1.5 ft
Vacant space for speakers (right): 1.5 ft
Flower Decor Length: 11.5 ft on each side
Stage Length: 6ft
Decorative Panels
Left white decorative laser-cut panel
Right white decorative laser-cut panel
Warm uplighting behind left panel
Warm uplighting behind right panel
White bouquet flowers at the corner of each side
Balloon Decorations
Left balloon pillar
Right balloon pillar
Mother Blue balloon on each side
Blue Chrome ballons
Silver Metallic balloons
Gold Metallic balloons
Floral Arrangements
Floral arrangement above left and right panel
Front floral arrangement across left and right stage
Blue flowers
White flowers
Gold-painted foliage/leaves
Green foliage
Decorative gold leaves
Pedestals
Left and right white Roman-style pedestal
Lighting Elements
Warm spotlight/uplight on left and right decor
Ambient stage lighting
Color Palette Visible
Royal Blue
Gold
Silver
White
Gray
Red (stairs/carpet)
Overall Design Components
Symmetrical stage layout
Central focal LED wall
Speaker standing areas on both sides
Corporate/event presentation setup
Floral stage-front border
Hospital assembly/graduation-themed stage design
The design appears balanced, with the 12-ft LED wall centered on a 32-ft stage, leaving approximately 11.5 ft of usable speaker space on each side, exactly as indicated in the mockup.